2024 RFP Documents

Final RFP Documentation

Addendum No. 1 (PDF) – Posted October 24, 2025

Revised RFP Document (PDF) – Posted September 27, 2024; Revised October 11, 2024 – Revisions noted in redline on Page 10, 24, 27, and 29.

RFP Appendix A-Q (Word) – Posted September 27, 2024

Battery Storage Design Criteria (Excel) – Posted September 27, 2024

Project Land Expense (Excel) – Posted September 27, 2024

Solar Energy Input Sheet (Excel) – Posted September 27, 2024

Solar Modeling Input Sheet (Excel) – Posted September 27, 2024

Thermal Data Review Form (Excel) – Posted September 27, 2024

Wind Energy Input Sheet (Excel) – Posted September 27, 2024

Domestic Content Decision Chart and Checklist (Word) – Posted September 27, 2024

Emerging Tech Data Review Form (Word) – Posted September 27, 2024

Energy Community Decision Chart (Word) – Posted September 27, 2024

Form Confidentiality Agreement

Mutual Confidentiality Agreement

Please return with the documentation noted in Section 6.1.4 of the RFP as follows:

-Verification of Site Control as required by Sections 3.2.12, 3.3.11, 3.4.12, and 3.5.8.

-Completed interconnection study as follows:

–PJM Projects: Completed PJM System Impact Study or Phase 1 Study, as required by Section 3.1.5, or

–MISO Projects: Completed Final DPP SIS and Network Upgrade Facilities Study and Firm Transmission into PJM as required by Section 3.1.5, or

–I&M Distribution Projects: Completed I&M Distribution Impact Study as required by Section 3.1.5

Technical Conference

October 4, 2024 Technical Conference – Posted October 4, 2024

Pre-RFP Stakeholder Feedback Documents

Draft RFP Document – Posted September 20, 2024

September 13, 2024 Pre-RFP Stakeholder Meeting Presentation