Final RFP Documentation
Addendum No. 1 (PDF) – Posted October 24, 2025
Revised RFP Document (PDF) – Posted September 27, 2024; Revised October 11, 2024 – Revisions noted in redline on Page 10, 24, 27, and 29.
RFP Appendix A-Q (Word) – Posted September 27, 2024
Battery Storage Design Criteria (Excel) – Posted September 27, 2024
Project Land Expense (Excel) – Posted September 27, 2024
Solar Energy Input Sheet (Excel) – Posted September 27, 2024
Solar Modeling Input Sheet (Excel) – Posted September 27, 2024
Thermal Data Review Form (Excel) – Posted September 27, 2024
Wind Energy Input Sheet (Excel) – Posted September 27, 2024
Domestic Content Decision Chart and Checklist (Word) – Posted September 27, 2024
Emerging Tech Data Review Form (Word) – Posted September 27, 2024
Energy Community Decision Chart (Word) – Posted September 27, 2024
Form Confidentiality Agreement
Mutual Confidentiality Agreement
Please return with the documentation noted in Section 6.1.4 of the RFP as follows:
-Verification of Site Control as required by Sections 3.2.12, 3.3.11, 3.4.12, and 3.5.8.
-Completed interconnection study as follows:
–PJM Projects: Completed PJM System Impact Study or Phase 1 Study, as required by Section 3.1.5, or
–MISO Projects: Completed Final DPP SIS and Network Upgrade Facilities Study and Firm Transmission into PJM as required by Section 3.1.5, or
–I&M Distribution Projects: Completed I&M Distribution Impact Study as required by Section 3.1.5
Technical Conference
October 4, 2024 Technical Conference – Posted October 4, 2024
Pre-RFP Stakeholder Feedback Documents
Draft RFP Document – Posted September 20, 2024
